Monitoring works for the 2014 Sochi Winter Olympic Games - Russia
| Land: Russia
| Ort: Sochi
| Beginn: 2011
| Ende: 2014
Sisgeo, thanks to the collaboration with its Russian partners AGT Systems and GPIKO, furnished and installed all the equipments necessary to monitor the most important road and railway works that are under construction in Sochi area, that is the neural centre of 2014 Winter Olympics.The monitored works are:
- retaining walls for the protection of roads, motorways and railways;
- rail and road tunnels;
- buildings.
The works on Sochi area required a particular attention, because all the territory is subjected to little and big landslides.
INSTALLIERTEN INSTRUMENTE
- System Setzungsmesssystem
- Schwingsaiten-Dehungsaufnehmer
- Inklinometermessrohre mit glatten Kupplungen (DISCONTINUED)
- TILLI, portabler Neigungsmesser
- Casagrande und Standrohr-Piezometer
- OMNIAlog Datenlogger
- Analoges Ketteninklinometer
- Inklinometermessrohr
- MPBX - Mehrfach-Bohrlochextensometer
- Draht-Extensometer
- CRD-400 Universal-Ablesegerät
- Elektrische Ankerkraftmessdosen
- Hydraulische Ankerkraftmessdosen
- Wasserlichtlote und Pegellatten
- Schwingsaiten- und Mehrfachpiezometer
- Rissmeter und Fugenmesser
- New Leonardo-Datenlogger (DISCONTINUED)
- Galileo-Datenlogger (DISCONTINUED)
- Punktschweissbare Schwingsaiten-Dehungsaufnehmer